Environmental feasibility study
In the business world, on 1994, it was not necessary to present the Environmental Impact Study (Feasibility Study).
Projects are divided into three categories when preparing the environmental feasibility study
First Category:
White list projects
There are no options to study public ecosystem assessment example:General shops
The second category "Gray List Projects" is divided into two types:
first:
You do not need to prepare environmental assessment studies, example Sports centers
The second:
You need to fill in the Environmental Assessment Form prepared by the Consultant Office for Qualified by the General Presidency of Meteorology and Environmental Protection examples 1. Gas stations, washing and lubrication 2. Games cities and recreational centers within cities. 4. Commercial markets complexes. 5. Rubber and plastic factories located
Third Category:
Blacklist projects
Projects that need to be prepared for a Environmental Feasibility Study , and propose solutions to ensure the design, establishment and operation of the site such as: 1. Wastewater treatment and purification plants and sewage networks; Municipal landfills.
Egyptian Ministry of Foreign Affairs.
Therefore, the main objective of the environmental feasibility study is to Study all the effects that the project may have on the environment
Determine the procedures to be implemented Studying the environmental impact ratio of the project
Conduct environmental feasibility study
Environmental impact is being studied:
1-Definition of the project
2-Revolutions and resources threatened when the project was established
3-dentify environmental problems
4-Determine the effects are gone and expect
5-Overall project evaluation
6-Preparation of three reports
1- Damage report
2. Environmental management
3. The Environmental Database
Therefore, we find that the environmental feasibility study is presented when creating projects ....
Wait for the second article
Environmental and non-environmental establishment of projects
In the business world, on 1994, it was not necessary to present the Environmental Impact Study (Feasibility Study).
Projects are divided into three categories when preparing the environmental feasibility study
First Category:
White list projects
There are no options to study public ecosystem assessment example:General shops
The second category "Gray List Projects" is divided into two types:
first:
You do not need to prepare environmental assessment studies, example Sports centers
The second:
You need to fill in the Environmental Assessment Form prepared by the Consultant Office for Qualified by the General Presidency of Meteorology and Environmental Protection examples 1. Gas stations, washing and lubrication 2. Games cities and recreational centers within cities. 4. Commercial markets complexes. 5. Rubber and plastic factories located
Third Category:
Blacklist projects
Projects that need to be prepared for a Environmental Feasibility Study , and propose solutions to ensure the design, establishment and operation of the site such as: 1. Wastewater treatment and purification plants and sewage networks; Municipal landfills.
Egyptian Ministry of Foreign Affairs.
Therefore, the main objective of the environmental feasibility study is to Study all the effects that the project may have on the environment
Determine the procedures to be implemented Studying the environmental impact ratio of the project
Conduct environmental feasibility study
Environmental impact is being studied:
1-Definition of the project
2-Revolutions and resources threatened when the project was established
3-dentify environmental problems
4-Determine the effects are gone and expect
5-Overall project evaluation
6-Preparation of three reports
1- Damage report
2. Environmental management
3. The Environmental Database
Therefore, we find that the environmental feasibility study is presented when creating projects ....
Wait for the second article
Environmental and non-environmental establishment of projects